← Catalogue

№ 3Collecting now

Active Construction Site

Heavy tools. Shifting ground.

Residential and light-commercial builds, interior fit-outs and renovation sites.

Useful for

  • Predicting how materials respond to tools outdoors
  • Construction robotics
  • Tool use

Get free sample data

Task groups
5
Tasks
28
Hours
Ask for the count
Narration
—
Sample footage
On request

Rated 1 to 5 from the shot list, not measured

Hand-object densityBimanual fine-motorTool varietyLighting variance

Conditions dust, outdoor glare, PPE

Pick your tasks.

Tick any to add it to your quote.

  1. 3.1
  2. 3.2
  3. 3.3
  4. 3.4
  5. 3.5

3.1 Site preparation and material handling

3.2 Structural and framing work

3.3 Enclosure and surface work

3.4 Interior fit-⁠out

3.5 Layout and measurement

Data cardEgocentric video, from a head or chest camera.
Picture
Set in your quote: 4K60 preferred, 1080p or any
Motion data
IMU at a nominal 200 Hz on the video clock, where recorded
Labels
Task codes 3.1.01 to 3.5.03, in order on the video clock; final labels only
Formats
Camera originals; also LeRobot v3, RLDS, HDF5 or MCAP
Licence
Per quotation, for machine-learning research and development Terms →

Four files per clip.

  • FV-A00xxx/
  • FV-A00xxx.MP4original camera file, telemetry intact
  • FV-A00xxx_imu.csvtimestamp_us, ax, ay, az, gx, gy, gz
  • FV-A00xxx_labels.jsonordered segments, codes 3.1.01 …
  • FV-A00xxx_meta.jsondevice, mount, site, collector, consent

What a lab receives →